VIDEOS OF FRAULINE UNDERGOING RESTORATION
Video 1, On the road - Sept 25 2014
Part of the trip from Hancock and Just where the new axle/Diff was fitted along with the left to right hand conversion. Making it's way to Mustangs and Australian Classics at McLaren Vale |
|
Video 2, On the road, Cont - Sept 25 2014 Still on the way to Mustangs and Australian Classics at McLaren Vale |
|
Video 3, The arrival - Sept 25 2014
Arriving at Mustangs and Australian Classics at McLaren Vale |
|
Video 4, Blasting - Nov 28 2014
After much body work and rust treatment Frauline undergoes Olivine blasting taking it all back to metal. There is still more body work to be done though. |
|
Video 5, Etched - Nov 28 2014
After being taken back to metal Frauline was treated to a coat of black etching. Also shown here is a walk around and the interior which shows the floor after all the boards were pulled up. |
|
Video 6, Very first run - Sept 2017
The very first test run. A drive of only around 7 kms. Transmission was slow in changing and engine a little sluggish but not pushed at all. Small amounts of white wispy smoke coming out under load. Not happening at idle. |
|
Video 7, Serafino's Winery - Sept 2017.
Out on its first run - Stopped in at Serafino's winery McLaren Vale for pics. |
|
Video 8, Engine start
The Cummins engine ALWAYS starts first time every time |
|